✓Caladan Certified✓Export Compliant✓30-Day Warranty✓Escrow Protected
Used AMAT Centura DPS II: What to Verify Before Buying — Applied Materials
Market listing photo
Market photo

Applied Materials

Used AMAT Centura DPS II: What to Verify Before Buying

Market Price

Request Quote — No current market data

Our sourcing team will find pricing within 4 hours

Request Quote →
Available by Request

Get a quote for this partResponse within 4 hours

Selling this part? Place an ask · Talk to a specialist · parts@caladansemi.com

✓Tested & inspected
✓Documentation included
✓Fast worldwide shipping
✓30-day functional warranty
✓Escrow payment available

Market Data

Coming Soon for Used AMAT Centura DPS II: What to Verify Before Buying

Price history and market activity data is being compiled.

Place a Bid or Ask →

How much does a used Used AMAT Centura DPS II: What to Verify Before Buying cost in 2026?

Pricing for used Used AMAT Centura DPS II: What to Verify Before Buying units varies by condition and configuration. Contact us for current 2026 market pricing. Get a quote.

Used Applied Materials Etch Equipment vs. buying new: is it worth it in 2026?

Used (2026)
✓Priced below new OEM
✓Inspected and functionally tested before shipment
✓30-day functional warranty
New OEM
—Full OEM list price
—Factory lead times apply
—New condition, full warranty
—Factory support included

Most buyers in 2026 choose used for cost and speed. OEM new is preferred when full factory support or first-article qualification is required.

What's included with a used Used AMAT Centura DPS II: What to Verify Before Buying from Caladan Semi?

Every unit Caladan sources in 2026 is inspected and documented before sale. Here's what you get:

  • ✓Functional test report and inspection photos
  • ✓Available documentation (manuals, service records where available)
  • ✓Availability: Available to Source — contact for current inventory
  • ✓Export compliance documentation (EAR99 or ECCN classification provided)

Confirm the chamber and mainframe configuration

Review an AMAT Centura DPS II offer as a configuration-specific purchase, not a model-name match. Applied Materials documents Centura DPS technologies within its etch portfolio. Ask the seller to identify the exact mainframe and each installed chamber before evaluating the offer.

Applied's portfolio page describes several Centura etch chamber technologies and wafer-size configurations. Do not treat the family's published capabilities as specifications for the particular DPS II package being offered.

Request photographs of the system and chamber nameplates, serial numbers, revision identifiers and the applicable manuals. Have your equipment engineer reconcile those records with the quotation.

What to match before approving a replacement or complete tool

For an existing installation, provide the installed mainframe, chamber identifiers, software version and target process. Ask the supplier to compare the proposed equipment against that record.

For a complete tool, request an itemized list covering the offered chambers, wafer handling, control system, RF equipment, pumps, gas-delivery hardware, cooling and accessories. Ask for a separate missing-items list and details of any modifications.

Use the Centura DPS parts page and Centura parts overview to prepare a parts inquiry. Require a part-number and revision check for each assembly; neither link establishes interchangeability.

Set process acceptance criteria

Before the seller runs a demonstration, have your process engineer define the target film stack, wafer requirements and measurement plan. Set the acceptance limits for etch rate, uniformity, selectivity, profile and particles as appropriate to your process.

Require the acceptance report to identify the equipment serial numbers, recipe, operating conditions, measurement method and exceptions. Ask qualified personnel to demonstrate wafer handling, vacuum operation, alarms and safety functions against the agreed plan.

Request maintenance, prior-process and decontamination records for the quoted equipment. Have the inspection team explain any gaps and specify how they will be resolved before shipment.

Review the SEMI S2/S8 buyer checklist when preparing the site's safety-document and acceptance requirements.

Compare the full installation scope

Ask for separate line items for equipment, refurbishment, spare assemblies, testing, deinstallation, packing and freight. Obtain written installation and service proposals, and have your facilities team review the utility documentation before committing to the purchase.

What should an RFQ include?

Send the requested DPS II configuration, intended process, wafer requirements, destination and required test documentation. For a chamber replacement, add the installed assembly's part number, revision and photographs.

Ask for a bill of materials, condition report, exceptions list and proposed acceptance plan with the quote. Do not approve an offer until the equipment identity and responsibilities for failed acceptance are clear.

Recent Market Listings

Updated Sep 30

No recent market activity for Used AMAT Centura DPS II: What to Verify Before Buying.

Submit a bid to get notified when sellers list this part.

Place a bid →

Related Parts

Quick Info

ConditionUsed
CategoryEtch Equipment

Get a Quote

Response within 4 hours. Export compliance handled.

Email parts@caladansemi.com

Or call us during business hours

Secondary Market

Place a Bid or Ask

Connect with verified buyers and sellers for Used AMAT Centura DPS II: What to Verify Before Buying.

Want to Buy
Want to Sell

All transactions are export compliant · Escrow available · parts@caladansemi.com