
Applied Materials
Used Applied Materials Centura: Configuration Checklist
Market Price
Request Quote — No current market data
Our sourcing team will find pricing within 4 hours
Request Quote →Selling this part? Place an ask · Talk to a specialist · parts@caladansemi.com
Pricing
Price on request — quote in 4 hours
Market pricing for Used Applied Materials Centura: Configuration Checklist moves with condition and availability. Our sourcing team will quote current pricing within 4 business hours.
How much does a used Used Applied Materials Centura: Configuration Checklist cost in 2026?
Pricing for used Used Applied Materials Centura: Configuration Checklist units varies by condition and configuration. Contact us for current 2026 market pricing. Get a quote.
Used Applied Materials Systems & Tools vs. buying new: is it worth it in 2026?
Most buyers in 2026 choose used for cost and speed. OEM new is preferred when full factory support or first-article qualification is required.
What's included with a used Used Applied Materials Centura: Configuration Checklist from Caladan Semi?
Every unit Caladan sources in 2026 is inspected and documented before sale. Here's what you get:
- ✓Functional test report and inspection photos
- ✓Available documentation (manuals, service records where available)
- ✓Availability: Available to Source — contact for current inventory
- ✓Export compliance documentation (EAR99 or ECCN classification provided)
Evaluating a used Applied Materials Centura? Request a configuration pack for the specific machine before approving an offer. Ask the seller to identify the tool, each included chamber and the equipment needed for the proposed installation.
What to match on a Centura offer
| Item | Ask the seller for | Your review |
|---|---|---|
| Main tool | Serial plate and configuration record | Match the quoted machine |
| Chambers | Model, serial, revision and service history | Check against the intended process |
| Handling | Wafer-format documentation and robot/controller identifiers | Approve the transfer arrangement |
| Peripherals | Itemized pump, power, cooling and control equipment list | Identify exclusions |
| Software | Version, option list and license documentation | Confirm required access and rights |
Have your engineer resolve discrepancies between labels, drawings and the quote. Request a documented approval for any replacement chamber or modified assembly; do not accept a platform-family reference as the entire compatibility check.
Acceptance before deinstallation
Agree on a witnessed test plan and the conditions under which each test will run. Request dated records for vacuum checks, handling sequences, alarms and the process demonstration your team specifies. Tie the results to the machine and chamber serial numbers.
Define pass/fail limits in the purchase agreement using your process requirements and the applicable equipment documentation. List any tests that cannot be completed before removal and assign responsibility for completing them after installation.
Scope the installed purchase
Request separate quote lines for the tool, refurbishment work, peripherals, decontamination documentation, disconnection, packing, transport, installation and qualification. Ask who owns each handoff and what happens if an acceptance test fails.
Can I buy a chamber instead of a complete system? State the exact assembly and revision in the RFQ and ask the seller to quote that scope explicitly.
What is the price or delivery time? Request a current written offer for the identified configuration, with exclusions and quote validity. Do not use an unrelated Centura listing as a confirmed quote.
Related buyer resources
Recent Market Listings
Updated Sep 30No recent market activity for Used Applied Materials Centura: Configuration Checklist.
Submit a bid to get notified when sellers list this part.
Place a bid →Related Parts
Applied Materials
Used Applied Materials Electrostatic Chuck (ESC)
PN: 0020-26018
Applied Materials
AMAT 0010-00049 Hexode Assembly for Wafer Etcher
PN: 0010-00049
Applied Materials
AMAT 0010-00557 Heat Exchanger Rev A
PN: 0010-00557
Applied Materials
AMAT 0010-02146 HDP-CVD RPSC Applicator 5200 CVD
PN: 0010-02146
Applied Materials
0010-07857 — Showerhead Assembly, 200mm CVD (Applied Materials)
PN: 0010-07857
Applied Materials
Applied Materials 0010-09082 Quartz Chamber Liner: P5000 PECVD Replacement
PN: 0010-09082
Quick Info
Get a Quote
Response within 4 hours. Export compliance handled.
Email parts@caladansemi.comOr call us during business hours
Place a Bid or Ask
Connect with verified buyers and sellers for Used Applied Materials Centura: Configuration Checklist.
All transactions are export compliant · Escrow available · parts@caladansemi.com